RFP Objective and Business Context
Procure PC stackable-crate molds engineered for food-beverage nested storage with demonstrated cavity stacking capability. Molds must process PC at 280β320Β°C melt temperature, achieve 0.5β0.7% shrinkage tolerance across 1.5β4 mm wall sections, and support multi-cavity stack configurations that double or triple output per cycle. Supplier must demonstrate prior stack-mold experience with food-contact polymers and modular center-section architecture. Procurement mode: design-build with first-article inspection (FAI) gate. Success metric: pilot production run delivering β₯95% dimensional conformance and zero solvent-induced stress cracking in PC parts.