Baseline Definition and Benchmark Scope
PC stackable crate molds are multi-cavity stack configurations with floating center sections and modular construction, typically producing 2β8 cavities per cycle. Baseline specifications include wall thickness 1.5β4 mm, melt processing at 280β320Β°C, and shrinkage compensation of 0.5β0.7%. Latin America benchmarks cover Mexico, Brazil, and regional contract manufacturers. Scope includes mold steel cost, machine time allocation, and plastic material consumption per shot. PC's high impact strength and optical clarity justify premium positioning, but poor solvent resistance requires careful post-mold handling. Stack-mold designs demand precision cooling channels, cam-operated ejection systems, and suction-cup removal mechanismsβcritical for cycle-time consistency and part quality across all cavities.