Our Product Range
Professional plastic moulds for diverse industries. From baskets to chairs, we deliver precision engineering and exceptional quality.
Product Categories
Choose from our four main product categories
Why Our Moulds Stand Out
Every mould we manufacture meets the highest international standards
1
Premium Steel
We use only high-grade mould steel (P20, 718H, S136) with mill certificates for traceability.
2
Precision Engineering
CNC machining centers and EDM equipment ensure tolerances within ±0.02mm.
3
Hot Runner Systems
Advanced hot runner technology for faster cycles and better product quality.
4
Optimized Cooling
Sophisticated cooling channel design for uniform temperature and minimal warpage.
5
Rigorous Testing
Every mould undergoes thorough trial runs before shipping to ensure perfection.
6
Lifetime Support
Technical assistance and spare parts available throughout the mould lifetime.