Baseline Definition and Benchmark Scope
This benchmark covers single-cavity and stack-mold configurations for PC logistics crates, targeting wall thicknesses of 1.5β4 mm with optical clarity and high-impact requirements. PC's 0.5β0.7% shrinkage and 280β320Β°C melt temperature impose strict thermal control and cooling-channel design, differentiating it from commodity resins. Stack-mold architectures double cavity count per cycle, reducing per-unit mold cost but requiring extended machine travel and advanced ejection systems (cam-operated actuators, suction cups). African baseline includes mold lead-times of 8β12 weeks, cycle times of 45β90 seconds per shot, and regional quality variance tied to cooling uniformity and gate design. Flexural modulus of 2.3 GPa ensures structural rigidity for stacked loads; poor solvent resistance requires post-mold surface protection specification.