Baseline Definition and Benchmark Scope
PC stackable-crate molds in the Middle East serve high-volume logistics applications requiring dimensional stability and impact resistance. Baseline scope covers single-cavity and multi-cavity stack configurations with PC wall thickness 2.0β3.5 mm, melt temperature 280β320Β°C, and shrinkage compensation 0.5β0.7%. Modular center-section design with air-ejection and cam-operated actuators defines the mold class. Benchmark includes material cost per cavity, tooling amortization over 500Kβ2M shot cycles, regional lead-time from order to first-article approval (FAA), and quality acceptance thresholds: dimensional tolerance Β±0.2 mm, surface finish Ra 0.8β1.6 Β΅m, and gate-mark visibility <0.5 mm. PC's optical clarity and high-impact strength are baseline expectations; poor solvent resistance is documented as a material constraint.