Loading...
Loading...
Process controls and measurements that keep mold quality consistent.
Checks applied from steel to trial samples
Material certificates and steel hardness checks
CNC/EDM in-process dimensional inspection
Electrode verification and cavity matching
Assembly fit, alignment, and parting line checks
Trial sampling with dimensional confirmation
Surface finish and texture verification
CMM, height gauges, hardness testers, and optical measurement are used to verify critical dimensions and surface requirements.
Trial shots confirm filling balance, part fit, and cosmetic quality before shipping approval.
Dimensional reports, trial sample photos/videos, and corrective action notes for approval before shipment.