Baseline Definition and Benchmark Scope
This benchmark covers single-cavity and 2Γ8 stack-mold configurations for PC logistics crates in Southeast Asia. PC's optical clarity and high-impact strength suit stacking applications, but its poor solvent resistance and 2.3 GPa flexural modulus require tight wall-thickness control (1.5β4 mm) to prevent creep under sustained load. Baseline scope includes mold cost (steel tooling), machine cost (cycle-time labor and energy), and material cost per shot. Stack-mold configurations demand floating center sections, air-ejection systems, and cam-operated actuatorsβcomplexity drivers absent in single-cavity designs. Regional benchmarks reflect Southeast Asia labor costs, material availability, and lead-time norms for PC resin sourcing.