Loading...
Loading...
Chair molds tuned for outdoor exposure, comfort, and long service life.
Key factors for hospitality seating
UV-resistant material guidance
Ergonomic armrest and backrest support
Surface finish for easy cleaning
Related mold options for this scenario
Armchair vs. armless chair
| Option | Best For | Key Advantage |
|---|---|---|
| Armchair | Comfort seating | Arm support + premium feel |
| Armless Chair | High-density areas | Lightweight handling |
Where hospitality chairs perform best
Cafe terraces and patios
Resort poolside seating
Outdoor dining and lounges
Typical choices for hospitality seating
UV-stabilized PP for outdoor durability; 718H or S136 depending on finish and corrosion exposure.
Textured surfaces, logo branding, and reinforced armrests for high-traffic use.
Common ranges for hospitality chairs
Cavity: 1
Cycle time: 45-65s (design dependent)
Part weight: 2.2-3.5kg (material dependent)
Stack target: 6-10 chairs (design dependent)
Steel: 718H or S136 (finish dependent)
Finish: matte or textured for outdoor use
What to confirm before tooling starts
UV additive not matched to target climate
Surface finish not aligned to premium line
Armrest strength not validated in trials
Information that speeds up quoting
Chair type (armchair or armless)
Target stack count and usage intensity
Material preference and UV exposure
Surface finish and branding needs
Annual volume and target cycle time
Market compliance requirements
Typical project conditions
Lead time: 45-60 days after approval
Payment terms: 30% deposit, 70% before shipping
Trial samples and inspection report before dispatch
Common procurement questions
Yes. We advise on UV additives and surface finishes for outdoor use.
Yes. Surface finish can be tuned for premium or high-use settings.
Yes. We can add embossed or debossed logos on the backrest.