Loading...
Loading...
FeaturedAn armless chair mold optimized for stable stacking and efficient cycle times. The design balances wall thickness and reinforcement to support everyday seating in indoor and outdoor settings. Ideal for volume programs that need consistent finish and durability.
Cycle Time
45-55 seconds
Mold Life
Typical 300,000-500,000 shots
Material
PP
| Product Size | 420 x 420 x 800 mm |
| Mold Size | 800 x 700 x 900 mm |
| Cavity | 1 cavity |
| Steel | P20 / 718H |
| Hardness | 28-32 HRC |
| Runner System | Hot Runner (Sequential) |
| Ejection | Hydraulic + Air Assist |
Armless chairs are commonly produced for events, cafeterias, and outdoor dining. This mold focuses on stacking stability, consistent finish, and repeatable cycle times for volume production.
Event seating, schools, rental fleets, and outdoor dining where chairs are stacked and transported frequently.
Chair failures typically start at leg junctions and seat edges. We reinforce these areas while keeping wall thickness balanced for clean surfaces.
Material savings through FEA-optimized design
45-55 second cycle time for maximum productivity
10-chair stackable design with 65mm per chair
4-point sequential injection eliminates visible weld lines
Common questions about our Plastic Armless Chair Mold
Stacking count depends on chair profile and material. We can tune the stacking geometry for your target count.
Yes. We recommend UV-stabilized PP for outdoor applications.
Yes. We can provide matte, textured, or polished surface finishes.
PP is standard for cost and durability; ABS is available for higher stiffness if needed.
Yes. We can include embossed or debossed logos on the backrest or seat area.