Loading...
Loading...
Design for Manufacturability checks that reduce cost, improve quality, and shorten lead time.
Key checks before tooling begins
Wall thickness, ribs, and draft angles
Gate location and flow balance
Parting line, undercuts, and slides
Ejection strategy and venting
Shrinkage, warpage, and tolerance stack-up
Material selection and surface finish
3D files, expected resin, target finish, tolerance priorities, and annual volume help us align DFM decisions with your goals.
Geometry adjustments, gate relocation, draft corrections, and tooling strategy changes to improve yield and cycle time.
DFM notes, risk items, recommended revisions, and a clear tooling plan before production starts.