Loading...
Loading...
Storage molds for retail product lines and home organization systems.
Key factors for organization products
Nest/stack geometry by use case
Texture and clear PP options
Consistent size families
Related mold options for this scenario
Storage boxes vs. baskets
| Option | Best For | Key Advantage |
|---|---|---|
| Storage Box | Stacked storage | Locking lid + optional wheels |
| Storage Basket | Open access | Lightweight and nestable |
Storage use cases that drive demand
Retail organization lines and sets
Closet and pantry storage
Warehouse picking and staging
Typical choices for storage product lines
PP for cost-effective volume; 718H for longer runs and textured surfaces.
Clear PP, woven textures, locking lids, and optional wheels for larger sizes.
Common ranges for storage products
Volume: 20-120L (family dependent)
Cavity: 1-2 (size dependent)
Cycle time: 20-60s (size dependent)
Part weight: 0.8-3.0kg (size dependent)
Steel: P20 or 718H (texture dependent)
Finish: smooth, textured, or clear
What to confirm before tooling starts
Clear PP needs higher polish not specified
Nest/stack geometry not aligned to shelf depth
Lid fit tolerance not tested with accessories
Information that speeds up quoting
Target size family and storage use case
Clear PP or texture requirements
Lid type, wheels, and accessories
Material preference and finish
Annual volume and target cycle time
Retail market and compliance needs
Typical project conditions
Lead time: 45-60 days after approval
Payment terms: 30% deposit, 70% before shipping
Trial samples and inspection report before dispatch
Common procurement questions
Yes. We can build size families with a consistent design language.
Yes. We can optimize polishing and processing for clarity.
Yes. We provide lid and accessory molds with fit tuning.