Loading...
Loading...

A storage box mold designed for efficient stacking and handling. The lid geometry supports secure closure, and optional wheels can be added for larger sizes. Clear PP is available for visibility where needed.
Cycle Time
40-60 seconds
Mold Life
Typical 300,000-500,000 shots
Material
PP
| Capacity Options | 20L / 50L / 80L / 120L |
| Components | Box + Lid + Optional Wheels |
| Steel | P20 / 718H |
| Hardness | 28-32 HRC |
| Runner System | Hot Runner |
| Ejection | Hydraulic |
Storage boxes need secure lids, stable stacking, and easy handling. This mold targets clean lid fit and reinforced sidewalls for daily use.
Warehousing, retail back-room storage, moving, and home organization where stacking and clear visibility are helpful.
We tune the lid fit to lock securely while keeping the box easy to open and close. Stacking stability comes from interlocking lid geometry and reinforced sidewalls.
Complete mold family: box + lid + wheels + dividers
4-corner snap clip with high-cycle design
Clear PP compatible with A-1 polish finish
Up to 5-high stacking with full loads (application dependent)
Common questions about our Storage Box Mold
Yes. Clear PP is supported with appropriate polish and processing.
We can use snap clips or latch designs based on the security level you want.
Wheels are optional and can be produced in a separate accessory mold.
Yes. The lid geometry supports stable stacking; limits depend on load weight and handling.
Yes. Divider inserts can be added as optional tooling.
Transparent, white, and neutral colors are common; UV stabilizer is recommended for light colors.