Loading...
Loading...

A bucket mold designed for daily utility with reinforced rim geometry and handle insert options. The design supports pouring spout details and volume markings for practical use across household and industrial settings.
Cycle Time
25-40 seconds
Mold Life
Typical 300,000-500,000 shots
Material
PP / HDPE
| Capacity Options | 5L / 10L / 15L / 20L / 25L |
| Mold Size | Varies by capacity |
| Cavity | 1 cavity |
| Steel | P20 |
| Hardness | 28-32 HRC |
| Runner System | Cold Runner / Hot Runner |
| Ejection | Stripper Plate |
Buckets are used across construction, agriculture, and household cleaning. This mold focuses on reinforced rim strength and reliable handle attachment for everyday handling.
Cleaning, construction, agriculture, and food-handling applications where durability and easy pouring are important.
We reinforce the rim and handle zones so the bucket can handle repeated lifting and pouring.
Triple-roll rim design for multi-year durability
Metal handle insert compatibility (wire/tube/flat bar)
30Β° precision pouring spout with anti-drip design
Calibrated measurement markings (typical tolerances)
Common questions about our Bucket Mold
Yes, with food-grade PP or HDPE and proper production conditions.
Metal wire or plastic handles are both supported depending on capacity requirements.
Yes. We can add embossed volume markings and verify during mold trials.
Yes. We can add embossed or debossed logos and label panels.
Yes. The rim geometry can be tuned for nesting or stacking as needed.