Decision Context and Winning Criteria
PE dominates cost-sensitive, opaque storage applications—bottles, drums, tanks—where chemical resistance to oils, solvents, and cleaning agents is critical. PC wins where transparency, impact toughness, and regulatory precision matter: clear food containers, stackable trays, and high-visibility beverage lids. PE's low stiffness (0.6–1.4 GPa flexural modulus) suits flexible squeeze bottles; PC's rigidity supports load-bearing designs. Melt temperature difference (PE: 180–230°C vs. PC: higher processing demands) drives cycle time and energy costs. Choose PE when: budget <$2/kg, opacity acceptable, wall thickness 2–5 mm. Choose PC when: transparency required, impact strength non-negotiable, dimensional tolerance <±0.1 mm, or regulatory food-contact certification essential.