Baseline Definition and Benchmark Scope
This benchmark covers single-cavity and multi-cavity PC backroom-crate molds (typical wall thickness 2β3.5 mm) produced by North American and near-shore suppliers. PC's 0.5β0.7% shrinkage and 280β320Β°C melt temperature require precise mold cavity design and thermal control to meet logistics durability standards. Baseline scope includes mold steel cost, cavity count (2β8 cavities), draft angles, and gate-runner optimization. Excludes custom inserts, secondary operations, and prototype iterations. Benchmark applies to production volumes 100kβ500k units/year per cavity. Regional scope: USA, Canada, Mexico-based molders with ISO 9001 certification and PC processing capability.