Decision Context and Winning Criteria
Choose PC when agriculture baskets require optical clarity, high impact resistance at 1.5–4 mm wall thickness, and dimensional stability (0.5–0.7% shrinkage). PE wins on chemical resistance to fertilizers, pesticides, and soil acids—critical for outdoor storage. PC's 2.3 GPa flexural modulus supports structural load-bearing; PE's lower stiffness suits flexible, stackable designs. Cost trade-off: PE molds run 25–35% cheaper tooling and material. Select PC for transparent inspection windows or premium branding; PE for durable, cost-effective bulk containers. Processing difficulty favors PE—PC's poor flow characteristics demand higher injection pressures and longer cycle times, increasing per-unit manufacturing cost.