Baseline Definition and Benchmark Scope
PC backroom crate molds for Southeast Asia logistics applications are defined as injection-molded containers with wall thickness 1.5β4 mm, optical clarity requirement, and impact resistance for stacking loads. Baseline scope covers molds producing 50β500 cavity configurations, typical shot weight 200β800 g per cycle. PC's low shrinkage (0.5β0.7%) and high flexural modulus (2.3 GPa) enable tight dimensional tolerances (Β±0.1β0.2 mm) critical for nested stacking. Benchmark excludes post-mold assembly, secondary finishing, or custom coating. Regional scope includes Thailand, Vietnam, and Malaysia suppliers with ISO 13849-1 mold safety certification and documented process capability for PC thermal cycling (280β320Β°C melt, 40β60Β°C mold temperature).