Decision Context and Winning Criteria
PE vs. PC selection hinges on three procurement dimensions: structural load, chemical exposure, and cost sensitivity. PE (melt temp 180–230°C, shrinkage 2.0–3.0%) excels in chemical-resistant bulk storage where flexural modulus 0.6–1.4 GPa suffices for thin-wall designs (2–5 mm). PC wins when agriculture storage demands impact resistance, UV stability, and stiffness under outdoor weathering. Choose PE when cost and chemical compatibility dominate; select PC when structural integrity and long-term durability justify 30–50% higher material cost. Wall thickness and load duration define the boundary: PE handles flexible containers; PC suits rigid structural components exposed to temperature cycling and UV.