Decision Context and Winning Criteria
PC versus PP selection hinges on optical requirements, impact durability, and total cost of ownership in logistics housings and household mold applications. PC's 2.3 GPa flexural modulus and superior impact strength justify premium pricing when transparency and structural integrity matter—e.g., protective covers, sight glasses, equipment housings. PP's 1.8–2.5% shrinkage and lower material cost dominate when opacity is acceptable and weight reduction drives value. For logistics containers, PP wins on cost and chemical resistance to oils; PC wins on clarity and temperature stability above 100°C. Define acceptance gates around wall thickness (PC: 1.5–4 mm typical), surface finish, and optical haze before tooling investment.