Decision Context and Winning Criteria
PC vs. PP selection for logistics baskets hinges on visibility, durability, and total cost of ownership. PC delivers exceptional optical clarity and impact strength (critical for transparent tracking baskets), with 0.5–0.7% shrinkage enabling tight tolerances. However, PC's poor flow characteristics complicate mold filling at 280–320°C, increasing cycle time and scrap risk. PP excels in processability and chemical resistance—essential for warehouses using cleaning agents—but sacrifices transparency and impact resilience. Choose PC when optical inspection of contents is non-negotiable and impact durability justifies higher tooling and material costs. Select PP when logistics baskets remain opaque, chemical exposure is high, and cost-per-unit production volume drives ROI.