Baseline Definition and Benchmark Scope
PC crate molds are structural injection tools designed for high-volume retail storage and logistics applications. Baseline specifications include wall thickness 2.0β3.5 mm (optimized for PC's 0.5β0.7% shrinkage), mold cavity count 4β16, and typical shot weights 800β2,200 grams. PC processing requires barrel temperatures 280β320Β°C with strict thermal control to maintain optical clarity and impact strength (key differentiators from ABS alternatives). Mold complexity is medium-high due to undercuts, snap-fit features, and dimensional tolerances Β±0.5 mm. Scope covers single-cavity and multi-cavity configurations sourced from ISO 9001 certified North American molders with documented PC material handling protocols.