Decision Context and Winning Criteria
Choose ABS when dimensional tolerance and surface finish are critical—ABS achieves tight tolerances (0.4–0.7% shrinkage) with excellent plating characteristics, ideal for stackable retail crates requiring precise nesting. Choose PC when impact resistance and transparency dominate—PC withstands repeated handling and outdoor exposure. ABS melt temperature (220–260°C) enables faster cycle times and lower energy costs than PC. Evaluate wall thickness: ABS performs optimally at 1.5–3 mm walls, reducing material cost by 15–20% versus thicker PC sections. Cost-per-part favors ABS in high-volume runs (>100k units) due to lower material density (1.03–1.06 g/cm³) and faster injection speeds. PC justifies selection only when chemical resistance or clarity requirements override cost sensitivity.