Baseline Definition and Benchmark Scope
This benchmark covers injection molds for retail backroom crates manufactured in polycarbonate across North American suppliers (US, Mexico, Canada). Scope includes single-cavity and multi-cavity tooling for crates with 1.5–4 mm wall thickness, typical volumes 500K–2M annual units. PC-specific parameters: melt temperature 280–320°C, shrinkage 0.5–0.7%, density 1.20 g/cm³. Benchmarks exclude custom inserts, gas-assist, or overmolding. Data reflects lead-times from tool design approval through first article inspection (FAI), encompassing steel selection, cavity machining, thermal management setup, and PC-specific gate optimization. Regional variation accounts for Mexican nearshore capacity versus US toolroom labor costs.