Baseline Definition and Benchmark Scope
Cold-chain crate molds in PC are defined by wall thickness 2.0β3.5 mm, structural ribs for stacking load (β₯50 kg per crate), and thermal isolation geometry. PC's density of 1.20 g/cmΒ³ and flexural modulus of 2.3 GPa enable impact resistance during logistics handling. Baseline scope covers single-cavity and multi-cavity molds (2β4 cavities) producing crate volumes 15β40 liters. Mold base cost ranges $18,000β$35,000 USD for North American suppliers; material cost per part averages $0.08β$0.14 depending on wall mass and resin grade. Benchmark applies to ISO 9001 and FDA-compliant molders within the continental US, Canada, and Mexico with documented process capability (Cpk β₯1.33 for critical dimensions).