Decision Context and Winning Criteria
PC excels when logistics crates demand optical visibility, high-impact toughness, and thermal stability above 100°C operating conditions. Its flexural modulus of 2.3 GPa and wall thickness range of 1.5–4 mm support rigid, transparent designs. ABS wins where chemical exposure (solvents, cleaning agents) dominates and cost minimization is critical. For outdoor logistics crates exposed to UV, moisture, and mechanical shock, PC's superior impact resistance justifies higher material cost. Establish winning criteria: if visibility or temperature >80°C is required, PC is mandatory. If chemical resistance or budget <$2/unit is non-negotiable, ABS becomes primary. Hybrid designs using PC ribs with ABS walls can balance both.