Decision Context and Winning Criteria
ABS logistics crates win when dimensional consistency and processing economy dominate: flexural modulus 2.1–2.8 GPa supports rigid sidewalls at 1.5–3 mm wall thickness, shrinkage 0.4–0.7% ensures repeatable nesting and stacking, and melt temperature 220–260°C minimizes energy cost per part. Choose ABS for high-volume, standard-duty distribution networks where crates cycle through temperature-controlled facilities. PC wins in harsh environments—frozen food, chemical exposure, outdoor staging—where impact resistance and heat resistance justify 15–25% higher material cost and extended cycle times. Decision hinge: if crates experience thermal shock, chemical splash, or drop impact >2 meters, specify PC; if logistics chain is climate-controlled and cost-per-crate drives margin, ABS prevails.