Baseline Definition and Benchmark Scope
PC outdoor logistics crates in Southeast Asia are defined by 1.5–4 mm wall thickness, melt-processing temperatures of 280–320°C, and 0.5–0.7% shrinkage tolerance. Crate molds typically accommodate stacking loads of 50–100 kg per unit, requiring flexural modulus of 2.3 GPa to resist deformation under compression. This benchmark covers aluminum or hardened-steel mold construction, cavity counts of 4–16, and production volumes of 500K–5M units annually. PC's optical clarity and high-impact properties suit outdoor visibility and drop-resistance requirements. Benchmark scope includes tooling cost, per-piece resin cost, cycle-time performance, and defect rates across Thailand, Vietnam, and Malaysia suppliers.