Loading...
Loading...
FeaturedThis shopping basket mold targets daily retail use with a durable handle mechanism and balanced wall thickness. The basket profile supports branding and consistent stacking during checkout or storage. Designed for reliable performance in high-traffic stores.
Cycle Time
35-40 seconds
Mold Life
Typical 300,000-500,000 shots
Material
PP / HDPE
| Product Size | 480 x 320 x 280 mm |
| Mold Size | 750 x 600 x 550 mm |
| Cavity | 1 cavity |
| Steel | P20 / 718H |
| Hardness | 28-32 HRC |
| Runner System | Hot Runner |
| Ejection | Hydraulic Cylinder |
Shopping baskets are used all day, every day. This mold focuses on handle durability, clean surfaces, and stable stacking behind checkout.
Ideal for supermarkets, convenience stores, and warehouse clubs that require repeatable quality and consistent branding across multiple stores.
The handle hinge is the highest stress area. We reinforce the hinge mounts and keep wall thickness balanced to avoid sink marks while maintaining strength.
High fold-cycle handle mechanism with reinforced design
25kg load capacity with a safety factor (application dependent)
Custom branding area 150x80mm on each side
Pantone/RAL color matching available
Common questions about our Shopping Basket Mold
Yes. We can include an embossed or debossed logo panel on the sidewall for long-term branding.
Yes. We can match brand colors using masterbatch and provide color samples for approval.
Yes. The rim geometry allows stable stacking behind checkout and in storage areas.
We can scale dimensions while keeping the same handle design and stacking alignment.
PP is common for retail baskets. HDPE is available when higher impact resistance is required.