RFP Objective and Business Context
Establish single-source supply agreement for PC household mold tooling with thin-wall cavity design (1.5β4 mm nominal). PC's 280β320Β°C melt temperature and 1.20 g/cmΒ³ density require robust mold cooling infrastructure to manage heat removal and prevent material degradation. Household mold applications demand repeatable cycle times (typically 45β90 seconds for thin-wall PC parts) and optical clarity retention across production runs. Supplier must demonstrate expertise in PC thermal management, air ejection systems for stack-mold configurations, and logistics-compatible part handling. Single-source arrangement requires validated backup capacity and documented process controls for long-term supply security.