RFP Objective and Business Context
Procure a PC stackable-series crate mold capable of molding 2–4 stacked cavity levels simultaneously, reducing per-unit cycle time and tooling amortization. PC's 2.3 GPa flexural modulus and 1.20 g/cm³ density deliver structural rigidity for food-contact crates under repeated stacking loads. Target wall thickness 2.0–3.5 mm balances flow, cooling, and impact durability. Mold must accommodate air ejection and cam-operated actuators for synchronized part removal across stack levels. Specify melt temperature window 280–320°C, cooling channel design for uniform shrinkage control (0.5–0.7%), and runner insulation to minimize resin waste in multi-cavity configurations. Supplier must demonstrate prior stackable-mold experience and CAE validation of flow balance across all cavity levels.