RFP Objective and Business Context
Procure a PP thin-wall cold-chain crate mold capable of 1.5β4 mm wall production with cycle time β€60 seconds at melt temperature 220β280Β°C. Mold must deliver first article samples within 8 weeks, validated for dimensional stability within PP's 1.5β2.0% shrinkage envelope. Crate design requires stacking load durability and chemical resistance to food-contact sanitizers and refrigerants. Supplier must demonstrate multi-cavity capability (minimum 4-cavity) for high-volume food-logistics production, with floating core architecture to manage thermal expansion during rapid cycling. Award contingent on approved FMEA, process capability study (Cpk β₯1.33), and first-article inspection report.