Baseline Definition and Benchmark Scope
A PP cold-chain crate mold in Southeast Asia is defined by wall thickness 2.0β3.5 mm, cavity count 4β8, and shot weight 800β2,500 g. Baseline scope covers injection tooling cost, cavity-to-gate cooling spiral design, cycle time under PP's narrow 220β280Β°C melt-temperature window, and regional lead-time from quote to first-article inspection. PP's 0.90 g/cmΒ³ density and 1.1β1.6 GPa flexural modulus enable thin-wall ribs for stacking strength without excessive gate pressure. Benchmarks exclude secondary operations (printing, assembly) but include UV-stabilizer gate location and cooling-channel diameter optimization (β€14 mm spiral diameter preferred to minimize pressure loss). Regional scope includes Vietnam, Thailand, and Indonesia mold shops with ISO 13061 capability.