Baseline Definition and Benchmark Scope
PP cold-chain crate molds are defined as multi-cavity injection tooling producing stackable, ventilated containers for temperature-controlled produce transport. Baseline scope covers African regional suppliers (East, West, Southern Africa hubs) molding PP at 220β280Β°C with wall thicknesses 1.5β4 mm typical for crate ribs and base. Material density 0.90 g/cmΒ³ yields part weights 180β420 g per crate unit. Shrinkage compensation targets 1.5β2.0% across cavity sets. Mold cooling employs spiral-method channels to manage localized heat concentration near gate zones. Benchmark captures 4β8 cavity molds, cycle times 45β75 seconds, and includes UV-stabilizer additive costs (PP's critical weakness without protection). Lead-time baseline: 10β14 weeks tooling, 2β4 weeks first production run.