RFP Objective and Business Context
Define procurement scope: single-cavity or stack-mold tooling for PC backroom crates requiring repeated assembly and stackability. Specify production volume, cycle time targets, and part geometry constraints. PC's melt temperature window (280β320Β°C) and shrinkage rate (0.5β0.7%) directly impact mold cavity tolerances and cooling channel design. Establish whether supplier provides first-article inspection (FAI) samples, cavity pressure monitoring data, and process capability studies (Cpk β₯1.33). Clarify if mold is Class 101 (high-volume production) or Class 102 (medium-volume) per DIN 16901. State expected mold lifespan in shot count and material cost baseline to anchor commercial negotiation.