RFP Objective and Business Context
Procure a single-source PC injection mold for consumer-goods crates with wall thickness 1.5β4 mm and L/t ratio β€200. PC material selection requires mold cavity design supporting melt temperature 280β320Β°C and tight shrinkage control (0.5β0.7%) to maintain dimensional stack-ability and optical clarity. Single-source award reduces supply risk and consolidates tooling responsibility. Establish baseline production volume, annual demand, and cost-per-cavity targets. Define whether center-gate or edge-gate configuration suits crate geometry and appearance requirements. Confirm mold life expectancy (minimum cavity count) and maintenance intervals for PC's lower solvent resistance.