RFP Objective and Business Context
Establish dual-sourcing capability for PP thin-wall cold-chain crate molds (1.5–4 mm nominal wall) serving consumer-goods refrigerated logistics. Mold must produce dimensionally stable crates with PP's inherent chemical resistance to cleaning agents and temperature cycling without UV degradation. Procurement targets 120–180 second cycle times per part, leveraging PP's 220–280°C melt processing window and 1.1–1.6 GPa flexural modulus for structural rigidity. Dual sourcing reduces supply risk and enables competitive pricing for high-volume production (500K+ units annually). Supplier selection prioritizes cooling system design (critical for thin-wall PP) and documented experience with food-contact polymer molds.