Use-Case Fit and Constraint Mapping
PC excels in food-beverage applications requiring optical clarity and high impact strengthβbeverage containers, food-processing machine components, and refrigerator drawers. Wall thickness 1.5β4 mm balances structural rigidity (flexural modulus 2.3 GPa) with injection cycle efficiency. PC's poor solvent resistance eliminates it from applications involving alcohol or aggressive cleaners; verify food-contact compliance (FDA CFR 177.1580). Density 1.20 g/cmΒ³ supports lightweight design. Cost reduction hinges on gate location optimization, runner system efficiency, and cavity count without exceeding mold cooling capacity. Shrinkage 0.5β0.7% demands tight dimensional control; specify holding pressure profiles to minimize sink marks on thick sections.