Use-Case Fit and Constraint Mapping
PC excels in consumer-goods applications requiring optical clarity and impact resistance—beverage containers, protective lenses, and appliance housings. Its flexural modulus of 2.3 GPa provides structural rigidity without brittleness. Wall thickness range of 1.5–4 mm accommodates both thin-walled transparent features and reinforced load-bearing zones. Density of 1.20 g/cm³ maintains lightweight designs. Critical constraint: PC exhibits poor chemical resistance to solvents and certain organic compounds, requiring careful product-contact material validation. Mold design must account for 0.5–0.7% shrinkage to achieve dimensional tolerances in high-volume runs. Capacity expansion demands validated gate locations and cooling strategies to minimize warping and optical defects across batch production.