System Boundary and Scope Definition
PC storage molds operate within a constrained thermal envelope: melt temperature 280–320°C, mold surface typically 80–120°C. Scope includes cavity fill-time prediction, gate location validation for 1.5–4 mm wall sections, and post-mold dimensional stability tracking over 72 hours. PC's 0.5–0.7% shrinkage range demands cavity compensation calculated before tool steel cutting; solvent resistance limitations (poor to many industrial chemicals) require material selection confirmation at design freeze. System boundary encompasses material supply qualification, mold temperature control infrastructure, and part geometry measurement protocols. Cross-functional handoffs occur at design release, tool tryout, and production launch; each phase requires documented process parameters and acceptance criteria tied to PC's optical clarity and impact performance requirements.