System Boundary and Scope Definition
PC crate tooling strategy encompasses mold design, cavity layout, cooling circuit topology, and process parameter windows specific to polycarbonate's 280–320°C melt range and 0.5–0.7% shrinkage behavior. Scope includes core-from-both-sides geometry to minimize sink marks in load-bearing walls, programmable fill-speed profiles to eliminate flow and weld lines, and mold temperature control (typically 80–110°C) to preserve optical clarity. Boundaries separate design validation (CAD, FEA, shrinkage prediction) from supplier tooling execution and process window establishment. Cross-functional handoffs occur at design release, tool commissioning, and first-article inspection. Food-beverage regulatory requirements (FDA contact, chemical resistance verification) drive material certification and traceability controls within the mold supplier's quality system.