Decision Context and Winning Criteria
PE vs PC selection hinges on stiffness requirements and cost sensitivity in logistics housings. PE (flexural modulus 0.6–1.4 GPa, density 0.94–0.97 g/cm³) excels in flexible, impact-resistant containers where 2–5 mm walls tolerate modest deflection. PC demands higher mold investment but delivers superior rigidity for structural load-bearing applications. Choose PE when: cost-per-unit and chemical resistance (excellent for oils, solvents) dominate; wall thickness flexibility matters; impact absorption is critical. Choose PC when: dimensional stability, clarity, and stiffness justify premium material cost; structural integrity under load is non-negotiable; aesthetic transparency required.