Decision Context and Winning Criteria
PE crate molds succeed in cost-sensitive, chemical-exposure applications where flexural modulus of 0.6–1.4 GPa and 2.0–3.0% shrinkage tolerance are acceptable. PC molds win when impact resistance, transparency, and tight dimensional stability dominate—food-contact containers, safety-rated designs, and premium retail packaging. PE's melt window of 180–230°C enables faster cycles and lower energy costs; PC requires tighter thermal control and longer cooling times. Choose PE when chemical compatibility (excellent against oils, detergents) and unit cost matter most. Choose PC when dimensional precision, optical clarity, and impact durability justify 15–25% higher material cost and longer cycle times. Crate wall thickness (PE: 2–5 mm typical) directly affects stiffness trade-offs and determines which material meets load-bearing requirements.