Decision Context and Winning Criteria
Choose PC when logistics containers require optical transparency, impact resistance above 2.3 GPa flexural modulus, or wall thicknesses of 1.5β4 mm with tight dimensional control. PC's 0.5β0.7% shrinkage demands computerized shrinkage evaluation and strict FIFO stock rotation to prevent batch degradation. Select PE when cost minimization outweighs clarity, or when chemical exposure to solvents is unavoidableβPC exhibits poor solvent resistance. For high-volume silo storage, PE tolerates broader temperature ranges and requires less rigorous environmental control. Logistics applications favoring rigid, transparent pallets or safety-critical containers benefit from PC's superior impact strength; bulk commodity bins favor PE's lower material and processing costs.