Baseline Definition and Benchmark Scope
This benchmark covers PC injection molds for outdoor retail baskets in Southeast Asia (Thailand, Vietnam, Malaysia). Scope includes molds with typical wall thickness 1.5β3 mm, cavity counts 2β8, and shot weights 150β800g. PC's 1.20 g/cmΒ³ density and 2.3 GPa flexural modulus support load-bearing basket structures. Baseline assumes cold-runner systems, standard ejection, and optical-grade surface finish (Ra 0.4β0.8 Β΅m). Lead-time measured from order confirmation to mold tryout completion. Cost includes mold steel, tooling labor, and first-article inspection. Cycle-time benchmarks reflect PC's melt-flow index (MFI) 8β12 g/10min and cooling requirements at 280β320Β°C barrel temperature, typical for outdoor durability grades.