Baseline Definition and Benchmark Scope
This benchmark covers polycarbonate (PC) basket molds for outdoor logistics applications manufactured in Southeast Asia. Scope includes molds producing containers with wall thickness 2.0β3.5 mm, typical shot weights 400β1200 g, and cavity counts 2β4. PC's 280β320Β°C melt temperature and 0.5β0.7% shrinkage establish baseline process windows. Outdoor basket specifications demand UV-stabilized PC compounds and gate designs minimizing weld-line stress concentration. Benchmark data reflects lead times from initial CAD handoff through first-article inspection (FAI), excluding material procurement delays. Regional suppliers evaluated include Tier-1 and Tier-2 mold shops in Thailand, Vietnam, and Malaysia with documented ISO 13485 or equivalent quality certifications.