Decision Context and Winning Criteria
Choose PC when retail baskets require optical clarity, high impact resistance, and premium appearance—typical for point-of-sale or display applications. PC's 2.3 GPa flexural modulus ensures structural rigidity with wall thicknesses of 1.5–4 mm, critical for load-bearing outdoor baskets. Choose HDPE when cost minimization and recyclability dominate: HDPE supports 10–25% post-consumer resin (PCR) blending, reducing material cost by 15–22% versus virgin PC. HDPE processes at lower temperatures (190–220°C vs. PC's 280–320°C), lowering energy consumption and cycle time. Winning criteria: PC for premium retail/visibility; HDPE for high-volume, cost-sensitive outdoor distribution centers.