Baseline Definition and Benchmark Scope
This benchmark covers PC crate molds (wall thickness 1.5–4 mm, cavity count 1–8 stack configurations) manufactured and molded in Latin America. PC's flexural modulus of 2.3 GPa and density of 1.20 g/cm³ support structural crate requirements; optical clarity and high-impact resistance justify premium material costs. Scope includes single-cavity molds ($0.72–$1.17 per part material + mold amortization) and 2×8 stack molds ($2.01 per part baseline). Regional lead times span 8–14 weeks for mold fabrication and 4–6 weeks for first-article production. Quality KPIs: dimensional tolerance ±0.2 mm, shrinkage control within ±0.1%, gate-mark severity <Grade 2, and surface finish Ra 1.6–3.2 µm for transparent sections.