Storage Box Mould
Household Mould

Storage Box Mould

Versatile storage box mould with matching lid and optional wheels. Clear PP material option for content visibility. Stackable and nestable design for space-efficient storage when empty.

Cycle Time

40-60 seconds

Mould Life

400,000+ shots

Material

PP

Key Features

  • Secure locking lid
  • Wheels option for large sizes
  • Clear PP material option
  • Stackable design
  • Reinforced handles
WhatsApp Us

Technical Specifications

Capacity Options20L / 50L / 80L / 120L
ComponentsBox + Lid + Optional Wheels
SteelP20 / 718H
Hardness28-32 HRC
Runner SystemHot Runner
EjectionHydraulic

Applications

Home Storage
Garage Organization
Moving
Commercial Storage

Organizing Life: The Storage Box Revolution

The home organization industry has grown into a multi-billion dollar market. Our storage box moulds help manufacturers meet surging demand with products that combine functionality and aesthetics.

E-commerce Packaging Partnership

A major online retailer needed branded storage boxes for:

  • Seasonal promotional campaigns
  • Premium unboxing experience
  • Post-delivery home organization
Our modular system allowed them to create a complete product line from one mould family.

Results:
  • 40% increase in customer reorder rate
  • Social media sharing of unboxing increased 300%
  • Storage boxes became best-selling add-on item

The Complete Storage System

A successful storage line requires multiple components:

ComponentMouldIntegration
Box bodyPrimary mouldBase product
Locking lidSecondary mouldPerfect fit guaranteed
Wheel setAccessory mouldSnap-on design
Divider insertsOptional mouldCustomizable organization

Size Range for Every Need

CapacityDimensions (LxWxH)Applications
20L400x300x180mmCloset, under-bed
50L550x380x280mmGarage, seasonal
80L600x450x320mmMoving, bulk storage
120L700x500x400mmCommercial, warehouse

Modular Design for Manufacturing Flexibility

Lid Locking Mechanism Engineering

The locking mechanism is critical for user satisfaction:

Locking Options

TypeSecurityConvenienceCost
Friction fitLowHigh$
Snap clips (2)MediumMedium$$
Snap clips (4)HighMedium$$
LatchesVery highLower$$$
We recommend 4-corner snap clips for optimal balance.

Clear PP Compatibility

Transparent storage boxes are increasingly popular:

Clear Material Considerations

  • Material: Random copolymer PP (clarified)
  • Wall thickness: +0.2mm vs. opaque (strength compensation)
  • Mould surface: SPI A-1 polish required
  • Processing: Higher melt temp, slower fill

Wheel Integration Design

Large storage boxes benefit from wheels:

Wheel System Specifications

  • Wheel diameter: 50mm (standard) / 75mm (heavy-duty)
  • Mounting: Snap-fit base plates
  • Load rating: 25kg per wheel
  • Swivel: Front pair, fixed rear pair

Stackable Design Engineering

Loaded boxes must stack safely:

  • Interlock depth: 8mm
  • Interlock clearance: 2mm per side
  • Maximum stack: 5 boxes loaded (150kg per stack)
  • Lateral resistance: 10° off-center still stable

Handle Integration

Large boxes need robust handles:

  • Handle cavity: 80mm width x 35mm height
  • Reinforcement ribs: 3 per handle
  • Comfortable grip radius: 15mm
  • Load rating: 40kg per handle pair

Why Choose Our Storage Box Mould

Complete mould family: box + lid + wheels + dividers

4-corner snap clip for 10,000+ open/close cycles

Clear PP compatible with A-1 polish finish

5-high stacking with 25kg loads each

Frequently Asked Questions

Common questions about our Storage Box Mould

Can the box be produced in transparent material?

Yes, we optimize moulds for clarified PP production. Transparent boxes require SPI A-1 polish and slightly different processing parameters. We provide material recommendations for best clarity.

How does the lid ensure a secure fit?

Our 4-corner snap clip design provides positive locking with tactile and audible feedback. Clips are designed for 10,000+ open/close cycles. Optional gasket groove available for dustproof/waterproof applications.

Are the wheels included in the box mould?

Wheels are produced in a separate accessory mould. The box mould includes wheel mounting receptacles as standard. We offer the wheel set mould as an optional add-on.

What is the stacking capacity when boxes are full?

With full 25kg loads, boxes can be stacked 5-high safely (125kg on bottom box). Empty boxes nest at approximately 3:1 ratio for efficient return logistics.

Can dividers be added for organization?

Yes, we offer optional divider insert moulds. Standard configuration is 2x2 (4 compartments). Custom divider layouts can be developed for specific applications.

What colors work best for retail?

Based on retail data: transparent (28% of sales), white (22%), grey (18%), and pastels (15%) are most popular. The mould accommodates all colors equally. We recommend UV stabilizer for lighter colors.