Dustbin MouldFeatured Product
Household Mould

Dustbin Mould

Comprehensive dustbin mould solution including body, lid, and pedal mechanism. Available in various sizes from 10L to 120L. Features smooth interior for easy cleaning and durable pedal mechanism for hands-free operation.

Cycle Time

Varies by size

Mould Life

500,000+ shots

Material

PP / HDPE

Key Features

  • Pedal mechanism included
  • Soft-close lid option
  • Inner bucket for easy cleaning
  • Multiple size options
  • Anti-odor lid seal
WhatsApp Us

Technical Specifications

Capacity Options10L / 20L / 50L / 120L
ComponentsBody + Lid + Pedal + Inner Bucket
SteelP20 / 718H
Hardness28-32 HRC
Runner SystemHot Runner
EjectionVarious per component

Applications

Home Use
Offices
Hotels
Public Spaces

Complete Waste Management Solutions

Our dustbin mould packages provide everything manufacturers need to produce professional-grade waste bins for homes, offices, and public spaces.

Hotel Industry Partnership

A leading hotel group standardizing waste bins across 200+ properties required:

  • Silent soft-close lids (guest comfort)
  • Fingerprint-resistant finish
  • Consistent quality across large orders
Our mould package enabled their supplier to produce 50,000 bins with consistent quality and zero mechanism failures.

The Complete System Approach

Unlike competitors who offer only the body mould, we provide:

  • Body mould: Main container
  • Lid mould: With integrated hinge
  • Pedal mould: Mechanism components
  • Inner bucket mould: Removable liner
This integrated approach ensures perfect component fit and simplified procurement.

Size Range for Every Application

SizeApplication
10LBathroom, bedroom
20LKitchen under-sink
50LKitchen standalone
120LOutdoor, commercial

Mechanism Engineering: The Soft-Close Difference

Soft-Close Lid Technology

The lid mechanism is what differentiates premium dustbins:

Traditional vs. Soft-Close

AspectTraditionalSoft-Close
Closing soundLoud slamSilent
Lid wearHigh (impact)Low (controlled)
User perceptionCheapPremium

Our Damper Integration Design

We integrate a damper housing into the lid mould:

  • Accepts standard rotary dampers
  • Self-locating damper position
  • Easy damper replacement

Damper Specifications

  • Torque: 15-20 N·cm
  • Rotation angle: 90°
  • Life: 50,000+ cycles

Pedal Mechanism Engineering

The pedal mechanism must balance:

  • Ease of operation (low force)
  • Durability (50,000+ cycles)
  • Reliability (consistent operation)

Our Design Solution

  • Pivot point optimized for leverage
  • PP+glass fiber for pedal (strength)
  • Metal pivot pin option for high-duty

Multi-Component Mould Package

Our complete package includes 4+ moulds depending on size:

ComponentMould TypeCavities
BodySingle cavity1
LidSingle cavity1
Pedal + linkageMulti-cavity4
Inner bucketSingle cavity1
All components designed for perfect fit with 0.2mm tolerance stack.

Why Choose Our Dustbin Mould

Complete 4-mould package: body, lid, pedal, inner bucket

Integrated soft-close damper housing

Size range from 10L bathroom to 120L commercial

50,000+ cycle pedal mechanism

Frequently Asked Questions

Common questions about our Dustbin Mould

What sizes of dustbin can this mould produce?

We offer mould packages for 10L, 20L, 50L, and 120L capacities. Each size is a separate mould package. The mechanism design scales appropriately for each size while maintaining consistent user experience.

Does the mould include the soft-close mechanism?

The mould includes integrated damper housing. The damper itself is a standard off-the-shelf component that we can source or you can purchase locally. We provide recommended damper specifications and supplier contacts.

What material is recommended for the inner bucket?

HDPE is recommended for the inner bucket due to superior chemical resistance and easy cleaning. The inner bucket mould produces smooth, seamless interiors with rounded corners for hygiene.

Can the dustbin body be made in different finishes?

Yes, we offer options for: matte finish (fingerprint-resistant), gloss finish (premium look), brushed metal texture (stainless steel appearance). Finish selection affects mould surface treatment.

How does the pedal mechanism connect to the lid?

We use a rod-and-lever system with pivot points at pedal and lid. The mechanism is designed for 50,000+ cycles with minimal wear. Metal pivot pin upgrades are available for commercial applications.