Complete Guide to Plastic Crate Mould Design: From Concept to Production

Boxumould TeamNovember 15, 202410 min read
Complete Guide to Plastic Crate Mould Design: From Concept to Production

Complete Guide to Plastic Crate Mould Design

Designing a high-quality plastic crate mould requires careful consideration of multiple factors. This guide covers the essential principles that lead to successful crate mould design.

Understanding Crate Requirements

Before starting the mould design, clearly define:

Functional Requirements

  • Load capacity (static and dynamic)
  • Stacking height and stability
  • Ventilation needs
  • Handling features (handles, forklift access)

Production Requirements

  • Annual production volume
  • Cycle time targets
  • Material selection
  • Color options

Key Design Principles

1. Wall Thickness Optimization

Consistent wall thickness is crucial for:

  • Even cooling and minimal warpage
  • Material efficiency
  • Structural integrity
Recommended wall thickness for crates:
  • Light-duty: 2.0-2.5mm
  • Medium-duty: 2.5-3.0mm
  • Heavy-duty: 3.0-4.0mm

2. Rib and Corner Design

Ribs add strength without adding material:

  • Rib thickness: 50-70% of wall thickness
  • Rib height: 3-5x wall thickness
  • Use radius at rib base to prevent sink marks
Corner reinforcement:
  • Add gussets at high-stress corners
  • Use radius instead of sharp corners
  • Consider stacking loads in corner design

3. Gate Location

For large crates, multiple gates are often necessary:

  • Hot runner systems with valve gates recommended
  • Gate placement should ensure balanced filling
  • Avoid gates in high-visibility areas

4. Cooling System Design

Efficient cooling reduces cycle time:

  • Conformal cooling for complex areas
  • Separate cooling circuits for core and cavity
  • Temperature differential control

Common Design Mistakes

Avoid These Issues:

  • Uneven wall thickness - causes warping
  • Sharp corners - stress concentration
  • Insufficient draft angle - ejection problems
  • Poor venting - burn marks, short shots
  • Inadequate cooling - long cycles, warping

Material Considerations

HDPE (High-Density Polyethylene)

  • Excellent impact resistance
  • Good chemical resistance
  • Lower stiffness than PP

PP (Polypropylene)

  • Higher stiffness
  • Better fatigue resistance
  • Good for living hinges

Conclusion

Successful crate mould design balances functionality, manufacturability, and cost. Work closely with your mould manufacturer during the design phase to optimize all aspects of your crate mould.